January 9, 2020

Anek Lines’ ASTERION II Went Out of Service for her Annual Dry Docking

Anek Lines’ large ASTERION II (31.804gt/1991) was in the Piraeus III dry dock from 4 to 7 January, performing scheduled repairs.

The ship arrived to NAFSI on December 14, 2019 while in the Adriatic Sea she was replaced by her fleet mate ELYROS. ASTERION II is expected to return back in service after January 20.

DFDS Takes Delivery of Fourth Mega RoRo

On 7 January, Jinling Shipyard handed over the fourth mega freight ferry to DFDS.

On 8 January the traditional flag hoisting ceremony took place.

Name: HUMBRIA SEAWAYS [link to MarineTraffic]