In the next few days, the project for the refurbishment of the site of the old shipyard of the Port of Valencia will be published with a tender budget of around 900,000 euros
It will also contemplate the recovery of reusable materials to be sold for an estimated value of more than 400,000 euros
The new public passenger terminal will be a model infrastructure in terms of the environment, sustainability, accessibility and intelligence, at the service of the city
According to the PAV project, which included contributions from the València city council, the passenger station will operate with zero polluting emissions and will be committed to the circular economy.
It will be located between the Muelle de Poniente and the Muelle Perfecto Palacio in the area previously occupied by the Unión Naval de Valencia shipyard (100,000 square metres).
The design will maintain the four elements of the old shipyard catalogued by the Demetrio Ribes Chair of Industrial Archaeology.
The new passenger terminal is intended to serve cruise traffic, regular lines with the Balearic Islands and Algeria, as well as ro-ro traffic.