June 4, 2020
The final two of nine ramps have been delivered to Ports of Stockholm.
Five were delivered to the recently rebuilt Värtahamnen Port and two to the Port of Kapellskär.
The last two ramps for the Norvik roro terminal arrived at Stockholm Norvik Port end of March.
Norvik terminal is scheduled to open in September and will be operated by Ports of Stockholm. The two quay-berths for RoRo vessels are 230m and 280m, respectively, with respective depths of 10.5m and 10m. Both the quays and the ramps are dimensioned to be able to handle vessels larger than those that currently call at Ports of Stockholm.