October 18, 2018
As expected Naviera Armas signed a contract with the Vigo-based Barreras shipyard. It will be the ninth ferry built by this yard for Armas.
The ro-pax ferry will have a capacity of 1,800 passengers, and will be 190m long.
She will be LNG-powered.
The delay in signing has to do with the acquisition of Trasmediterranea, which had to be approved by the authorities.
In fact, this ferry had been initially assigned to Armón Gijón, but the contract was cancelled due to the insufficient draft of this shipyard.