Incat’s New Hybrid Ferry Available for Charter – Second Vessel to Follow

March 30, 2025

Incat Tasmania’s new 78-metre hybrid electric ferry, currently under construction, will be available for charter from the first half of 2026. A second, sister vessel is planned and could follow within 12 months of delivery.

Key features:

  • Flexible propulsion: fully electric, hybrid or generator-assisted
  • Near-zero emissions (ESS up to 12 MWh)
  • Charging capacity: up to 10 MW
  • Capacity: 600 passengers
  • Top speed: 27 knots
  • Flexible vehicle deck configurations with optional mezzanine decks
  • 2 x 230 kW bow thrusters and bridgewing controls

Designed to replace ageing high-speed craft, the vessel combines lower operating costs with compliance to evolving environmental standards.